High quality A Grades breathe freely plastic rubber runway

FOB Reference Price:Get Latest Price
US $1.99-3.2 / Kilograms | 500 Kilogram/Kilograms (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Hebei, China (Mainland)
Brand Name:
Great Wall
Model Number:
GW0001
Color:
Red,green,and etc.
Advantage:
Perfect flexibility.shock absorbing.better abrading,long time using.
use time:
At least 8 years
certificate:
IAAF
Material:
NR + SBR
Application:
school GYM
Product Name:
plastic rubber runway
Surface:
particle
Feature:
breathe freely plastic
brand:
aotai
Supply Ability
Supply Ability:
300 Ton/Tons per Month
Packaging & Delivery
Packaging Details
1,Packing in plastic with white bag.
2,Packing in wooden pallets.
3,According to customers requirement.
Port
Tianjing-xingang
Lead Time :
15days

Specifications

Perfect flexibility.shock absorbing.better abrading,long time using. 
Red,green,and etc. 
At least 8 years. 
IAAF certificate.

Breathe freely plastic runway

 

1.Products description                                                                                                                                     

 

 Its made of multi-layer and it has the high capability structure, it has long time utilization, excellent flexibility and dynamics design character. Top layer is mixed with EPDM grain and the same colored PU paint, which can cover the surface and form the special but organizational lines. This endows the right attachment friction and slip resistance. It has the perfect flatness after mechanical working. The interspace settles seeper problem, and can be used immediately after raining, this increases using frequency.

 

2.Products characteristics                                                                                                                               

 

 All weather used, perfect flexibility, shock absorbing, better abrading, long time using, better compressibility, anti-nail, flat, better joint and firmly using.                                                                                                                                                               
Shortcut construction due to especial material, it has less demand on weather. This has cut down time needed for construction.                                                                                                                                                        

 

The draining systerm can expel seeper after heavy rain.

 

Perfect knit--special machines for construction ensure different range of thickness and flatness.

 

Endurable: Because of the special constructing management, it has strong viscidity, which can prevent the ascend of water, so there is no pickle, separating, etc.                                                                                                                                                               
Perfect appearance it can provide various color matches. The special configuration reduces the straight reflection, offers beautiful appearance .         

 

High utilization: Beautiful color, the grain will not easily peel off, simple maintenance, save managing cost, high using frequency.    

 

3.Construction   process                                                                                                                                  

 

 Keep the court tidy and clean  ,use waterproof coating for concrete ,black powder   for asphalt surface.                                                                                
Machines lay 10mm in thickness, spray the black granules mixed with glue.                                                          
Gush the flexibility layer 1.5mm in thickness .                                                                    
Gush the flexibility layer 1.5mm in thickness on the contrary direction.                                          
Measurement, sample and expanding line.                                                                        
Court  cleaning. 
                                                                                                                                                    

 

 4.Application                                                                                                  

 

 Various of schools and special palestra, course of ground track field, semi-circle section,  assistant   section.                                                                                           
 Path for people to take exercises .                                                                           
 Inner gymnasium training runway.                                                                          
 Kursaal path layer .

                                                                                                 

 

sample room

ok

 

 

test equipment

 

 

machine

 

 

packing

zuihou baozhuang

 

 

container

                                              

 

 

 

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like